Stead Park Update

The Council redevelopment group have given permission to use the dugouts, tech bench and scoreboards.

 

The tech bench isn’t quite finished but will be this week, and  the scoreboard uses the same controller but needs to be switched on at the power point  in the tech bench (to be confirmed)

 

Drinking water tap – is located on the South west  corner of the pitch near the construction area. Not the most ideal location but at least there is a tap now.  Signage will be put up beside the small gate to the path across to pitch 2 and also on the gate  into the pitch to indicate the location.

 

The ice freezer will go back into the Tech bench at the working bee on Saturday.

 

A new set of double gates have been put in the South fence to allow ambulance access if required via the short street between the buildings  – “Winston Walk”

 